Interchange 1/9 – New Entrance into Jerusalem


 

Interchange 1/9 is the main bridges system at the entrance to Jerusalem coming from Tel Aviv.
The piers foundation is on drilled cast in situ small diameters piles (60 cm).

The drilling was performed with down the hole machines. Ultimate friction on piles has been measured using loading tests.

בניית אתרים
Jump to page content